Environmental Construction

Project category

Environmental Construction

Site restoration, regrading, erosion control and revegetation performed to agency specification and documented through closeout.

Category overview

What this work involves.

Environmental construction projects cover grading and restoration of disturbed ground, erosion and sediment control, channel and drainage work, and re-establishment of native vegetation.

Project entries in this category will document existing conditions, the means and methods used, and the condition of the site after the establishment period.

Typical scope

  • Site restoration and regrading
  • Erosion and sediment control
  • Revegetation and hydroseeding
  • Channel and drainage restoration
  • Reclamation earthwork
  • Environmental compliance documentation

Projects in this category

Case studies.

Each entry below uses our standard case study template — challenge, solution, construction process, results, photography and related services. Replace the labeled fields with verified project information.

NV Energy ON Line Transmission Project — Construction Progress

Environmental Construction · Case study 01

NV Energy ON Line Transmission Project

Client
NV Energy (subcontract role)
Location
Nevada
Year
Completed
Category
Environmental Construction

Access road construction, tower pad development, cactus and succulent salvage and large-scale seeding along a high-voltage transmission corridor. Sand Stone participated as a subcontractor.

  • New access road construction
  • Tower pad site development
  • Succulent salvage and temporary nursery management
  • Broadcast and drill seeding
  • Revegetation across multiple vegetation zones

Challenge

The corridor crossed several distinct desert vegetation zones with protected succulents inside the right-of-way, requiring salvage, holding and replanting alongside heavy access-road construction.

Solution

Crews salvaged all succulents within 24 feet of the right-of-way and maintained them in temporary nurseries for post-construction replanting, while access roads and tower pads were built and later reseeded by zone using both broadcast and drill seeding.

Construction process

  1. 01

    Salvage

    Succulents within 24 feet of the right-of-way were salvaged and moved to temporary nurseries.

  2. 02

    Access & Pads

    Over 80 miles of new access roads and 140 acres of tower pad sites were constructed.

  3. 03

    Seeding

    Broadcast and drill seeding performed across 1,300 acres of several vegetation zones.

  4. 04

    Replanting

    More than 40,000 salvaged plants were held and returned to the corridor after construction.

Results

Access Roads
80+ miles

New access roads constructed.

Tower Pads
140 acres

Tower pad sites developed.

Seeded Area
1,300 acres

Broadcast and drill seeding across several vegetation zones.

Plants Salvaged
40,000+

Succulents maintained in temporary nurseries for replanting.

Photo gallery

Access road construction along the transmission corridor.
Construction Progress
Sand Stone field crew and equipment on the ON Line corridor.
Crew
Palmer Solar — Drone Photography

Environmental Construction · Case study 02

Palmer Solar

Client
Palmer Solar (subcontract role)
Location
[Location — confirm]
Year
Completed
Category
Environmental Construction

Development of a 50-acre solar field with erosion control and environmental protection measures for endangered species. Sand Stone participated as a subcontractor.

  • 50-acre solar field development
  • Erosion and sediment control
  • Endangered species protection measures
  • Culvert and channel installation
  • Terra Lock stabilization and Dust Lock dust suppression

Challenge

Construction had to proceed across a 50-acre field while preserving endangered species habitat and managing drainage and fugitive dust on open, disturbed ground.

Solution

Comprehensive erosion and environmental measures were installed alongside 14 large culverts and channels, with Terra Lock applied for surface stabilization and Dust Lock for dust suppression across the working area.

Construction process

  1. 01

    Environmental Controls

    Protection measures established for endangered species prior to disturbance.

  2. 02

    Drainage

    14 large culverts and channels installed to manage site drainage.

  3. 03

    Stabilization

    Terra Lock applied to stabilize surfaces across the solar field.

  4. 04

    Dust Control

    Dust Lock applied for ongoing fugitive dust suppression.

Results

Solar Field
50 acres

Developed with erosion and environmental measures.

Culverts & Channels
14

Large culverts and channels installed.

Photo gallery

Aerial view of the completed solar field.
Drone Photography
Hero image

Environmental Construction · Case study 03

Project Name

Client
Client Name
Location
Location
Year
Year
Category
Environmental Construction

Project Description — add scope, site conditions, methods used and the outcome once this project is documented.

  • Scope Item
  • Scope Item
  • Scope Item

Challenge

Challenge — describe the site conditions, permit requirements or constraints this project had to solve.

Solution

Solution — describe the approach, materials and methods selected, and why they suited the site.

Construction process

  1. 01

    Mobilization

    Construction Process — describe this phase.

  2. 02

    Installation

    Construction Process — describe this phase.

  3. 03

    Establishment

    Construction Process — describe this phase.

  4. 04

    Closeout

    Construction Process — describe this phase.

Results

Results — quantities, performance, inspection outcomes and establishment results are published only once verified for this project.

Photo gallery

Before
After
Drone Photography
Construction Progress
Completed Project
Equipment
Crew

Project entries are placeholders. Project names, clients, locations, descriptions and photography are added only once verified by Sand Stone Constructors.

Photography

What we capture on every project.

A consistent photo set makes each project comparable and gives owners, agencies and bid reviewers a complete picture of the work.

  • Before

  • After

  • Drone Photography

  • Construction Progress

  • Completed Project

  • Equipment

  • Crew

Imagery shown is representative. Each slot is sized to accept Sand Stone project photography without layout changes.

Start the conversation

Bring us in early. It costs less than fixing it later.

Send us your scope, plan set or permit conditions. We'll tell you what the site actually needs — and what it will take to deliver it.