Skip to content
Sand Stone Constructors logoSand StoneConstructors
Soil Stabilization

Project category

Soil Stabilization

Engineered soil stabilization and fugitive dust control for haul roads, laydown yards, slopes and disturbed surfaces.

Category overview

What this work involves.

Soil stabilization projects bond loose surfaces so they hold under traffic, wind and rainfall — reducing watering cycles, surface maintenance and dust exposure.

Project entries in this category will document soil conditions, the treatment and application rate used, and the performance observed after application.

Typical scope

  • Haul road and access road stabilization
  • Laydown yard and staging area treatment
  • Fugitive dust control programs
  • Slope and stockpile stabilization
  • Application rate calibration and monitoring

Projects in this category

Case studies.

Each entry below uses our standard case study template — challenge, solution, construction process, results, photography and related services. Replace the labeled fields with verified project information.

Komatsu Mining Facility & Haul Roads — Completed Project

Soil Stabilization · Case study 01

Komatsu Mining Facility & Haul Roads

Client
Komatsu (subcontract role)
Location
[Location — confirm]
Year
Completed
Category
Soil Stabilization

Site development for a 50,000 sq ft facility addition plus 15 miles of haul road construction and maintenance using Terralok, Sublok and Dust Lok. Sand Stone participated as a subcontractor.

  • Site development, excavation and grading
  • Utility and underground work
  • Asphalt paving for a 50,000 sq ft facility addition
  • 15 miles of haul road construction and maintenance
  • Terralok, Sublok and Dust Lok applications

Challenge

A working mining operation required both a facility expansion and durable haul roads that could carry heavy equipment while controlling dust and limiting ongoing road maintenance.

Solution

Site development, underground utilities and paving were self-performed for the facility addition, while haul roads were built and maintained with Terralok, Sublok and Dust Lok for cost-effective, environmentally friendly and durable running surfaces.

Construction process

  1. 01

    Site Development

    Excavation, grading and utility/underground work for the facility addition.

  2. 02

    Paving

    Asphalt paving for the 50,000 sq ft facility addition.

  3. 03

    Haul Roads

    15 miles of haul road constructed and maintained.

  4. 04

    Stabilization

    Terralok, Sublok and Dust Lok applied for endurance and dust control.

Results

Facility Addition
50,000 sq ft

Site development, utilities and paving.

Haul Roads
15 miles

Constructed and maintained with Terralok, Sublok and Dust Lok.

Photo gallery

Completed Komatsu facility addition.
Completed Project
Haul road grading and compaction.
Construction Progress
Haul trucks operating on treated mine roads.
Equipment
Related servicesSoil Stabilization Dust Control Terralok Solutions PDF available once published
Hero image

Soil Stabilization · Case study 02

Project Name

Client
Client Name
Location
Location
Year
Year
Category
Soil Stabilization

Project Description — add scope, site conditions, methods used and the outcome once this project is documented.

  • Scope Item
  • Scope Item
  • Scope Item

Challenge

Challenge — describe the site conditions, permit requirements or constraints this project had to solve.

Solution

Solution — describe the approach, materials and methods selected, and why they suited the site.

Construction process

  1. 01

    Mobilization

    Construction Process — describe this phase.

  2. 02

    Installation

    Construction Process — describe this phase.

  3. 03

    Establishment

    Construction Process — describe this phase.

  4. 04

    Closeout

    Construction Process — describe this phase.

Results

Results — quantities, performance, inspection outcomes and establishment results are published only once verified for this project.

Photo gallery

Before
After
Drone Photography
Construction Progress
Completed Project
Equipment
Crew
Related servicesSoil Stabilization Dust Control Terralok Solutions PDF available once published

Project entries are placeholders. Project names, clients, locations, descriptions and photography are added only once verified by Sand Stone Constructors.

Photography

What we capture on every project.

A consistent photo set makes each project comparable and gives owners, agencies and bid reviewers a complete picture of the work.

  • Before

  • After

  • Drone Photography

  • Construction Progress

  • Completed Project

  • Equipment

  • Crew

Imagery shown is representative. Each slot is sized to accept Sand Stone project photography without layout changes.

Start the conversation

Bring us in early. It costs less than fixing it later.

Send us your scope, plan set or permit conditions. We'll tell you what the site actually needs — and what it will take to deliver it.